The intersection at Chicago and Halsted has been closed for more than a year. Since the Chicago Avenue bridge closed on September 29, 2025, nobody has driven, biked or walked across that stretch of the river. The closure runs along Chicago Avenue from Larrabee Street to Peoria Street and along Halsted Street from Ancona Street to the river. Next to the work zone, Bally's casino reached its topping-off ceremony on April 30, 2026, when crews set the final support beam.
Halsted Street comes back first, the rebuilt Chicago Avenue bridge follows in spring 2027, and the casino opens on a schedule set by Bally's. For anyone living between the river and the Kennedy, the next six months follow that order. Until the first piece reopens, the easiest part of River West to use is the Grand Avenue edge.
Halsted Street should reopen first
The Chicago Department of Transportation splits the project into two dates. On its project page for the Chicago Avenue Bridge and Halsted Street Viaduct, the estimated completion for Halsted Street is December 2026 and for the Chicago Avenue bridge is spring 2027. Construction started in August 2025.
The bridge date has already moved. Block Club Chicago reported on October 30 that CDOT Commissioner William Cheaks told alderpeople the bridge work will now run through spring 2027. The earlier projection had it finished by the end of this year. Cheaks also said the Halsted viaduct was still on track to reopen later this year. December is an estimate, not a set day, so check CDOT's page before changing your commute around it.
One transit date lines up with that estimate. CTA lists the #8 Halsted reroute as running through December 31, 2026. In both directions, buses currently leave Halsted and run on Division, Elston and Milwaukee before rejoining Halsted. If the viaduct reopens on time, the #8 should return to its normal route around the start of the new year. The CTA alert is the place to confirm that.
Until then, Grand Avenue does the work
A reopened Halsted still leaves Chicago Avenue closed at the river through the winter. Meanwhile most of the rerouted traffic runs along Grand Avenue. CDOT sends northbound Halsted drivers east on Grand, north on Orleans and west on Division. Southbound drivers take Division east, LaSalle south and Grand west. Eastbound Chicago Avenue traffic is sent south on Ashland and east on Grand before turning north on Orleans. Westbound traffic goes down Wells to Grand and up Ashland. Each of the four detours uses Grand Avenue for part of its route.
CDOT has made changes to that corridor to handle the load. It added "No Left Turn" and "No Parking" signs at several intersections along Larrabee, Grand and Superior, and refreshed the pavement markings on Grand. It also put up "Local Traffic Only" signs east of the project and near Kingsbury and Chicago to keep cut-through drivers off residential streets. If you park on the street near Grand, check the posted signs before you leave the car.
The #66 Chicago Avenue bus uses the same streets. Since September 29, 2025, eastbound buses have run on Chicago, Milwaukee, Grand and Orleans, and westbound buses on Chicago, Wells and Grand before returning to Milwaukee. CTA lists no end date for this reroute. As a result, the #66 passes the Grand and Milwaukee corner, where the Blue Line's Grand station sits at 502 N. Milwaukee. That station connects to the #8, #56, #65 and #132 buses. The Blue Line runs 24 hours a day, and its Chicago station is the other rail option for the north end of the neighborhood.
Several restaurants that Eater Chicago listed this year are on the blocks around that corner, and you can reach all of them without crossing the closed bridge. Mazor, at 485 N. Milwaukee, is a counter-service Guatemalan Mexican spot built around fresh nixtamalized corn masa. Chef Cristian Orozco runs the kitchen, and there is a $50 tasting menu. It made Eater Chicago's October 2026 list of the best new restaurants. Down the block, Perilla at 401 N. Milwaukee is a Korean American restaurant with barbecue that appeared in Eater's April 2026 guide to Korean restaurants. In February 2025, Eater reported that a sushi hand-roll counter called Noriko was opening in Perilla's basement.
Two Italian restaurants from Eater's June 2026 Italian guide are on the same edge of the neighborhood. Piccolo Sogno at 464 N. Halsted serves rustic Italian food, pasta and pizza and has a garden patio. La Scarola, at 721 W. Grand, is an Italian-American restaurant on the detour route itself. Halsted is closed only north of Ancona, so you can still reach Piccolo Sogno's block of Halsted from Grand.
In spring, Chicago Avenue reopens with a new layout
The bridge that reopens in spring 2027 will work differently from the one that closed. CDOT's plan removes the old temporary bridge and replaces it with a tied-arch bridge. It also rebuilds the Chicago-Halsted viaduct from scratch, adds a riverwalk connection under the new bridge, and puts dedicated CTA bus lanes on Chicago Avenue and protected bike lanes on Halsted. The plan also includes a new traffic signal at Chicago Avenue and Jefferson Street, updated signals at three intersections, new street lighting and landscaping.
For #66 riders, the dedicated bus lanes are the change to watch. When the bridge reopens, the bus will be returning to a different Chicago Avenue from the one it left in September 2025. For anyone who walks or bikes, the riverwalk connection under the bridge means the new crossing will have a path along the water as well as a sidewalk over it.
The Lake Street bridge farther south is closed to both vehicles and pedestrians. CDOT sends people on foot along Canal Street to Wacker Drive via Randolph Street and expects the bridge to fully reopen in January 2028. To the north, the Cortland Street bridge is still closed to cars but open to people walking and biking, according to Block Club's October 13 report.
The casino has its own schedule
Bally's permanent casino on the former Chicago Tribune printing plant site follows a timeline separate from the bridge, and that timeline has moved more than once. Bally's had been aiming for a September opening this year. By the time of the April topping-off, the target was early 2027. The Chicago Sun-Times reported on August 9 that Bally's was slowing construction and stopping work on the hotel, the event center and some restaurants, with no date to restart. The company said the casino itself was still set to open in early 2027. Three days later, the Sun-Times reported that alderpeople said work on the casino floor was continuing while the non-gaming construction slowed. A City Council majority called the pause a possible breach of the host agreement, and Bally's said it would honor its commitments.
The parts of the complex that most affect daily life are among the parts still to come. The full plan includes a 500-room hotel tower, a 3,000-seat entertainment venue, six restaurants, a food hall, three bars and a two-acre public park. According to Urbanize Chicago, it also includes a riverwalk extension of about 2,000 feet along the lower riverbank, with parking above the casino building. Put the two calendars together, and early 2027 could see the casino floor opening before or around the time the new bridge does. The hotel, venue and some restaurants follow whenever Bally's restarts that work.
Across the river, the next big project is already in the ground. Chicago YIMBY reported in April that construction had started on the first Halsted Pointe tower at 931 N. Halsted on Goose Island. It is a 46-story building with 460 homes, 92 of them affordable, and caisson drilling was underway. The address is a few blocks up Halsted from the Chicago Avenue intersection.
If you live near Chicago and Halsted and are wondering what a rebuilt corner and a new casino mean for your own place, the Klopas-Stratton Team is glad to talk through timing with you as each piece of the corner reopens.